To get a chance of working in a dynamic organization. Where my education presentation, analytical problem solving, technical skills and ability would be utilized and I shall have an oppertunity to improve on it.
Best way cement hattar line ii haripur kpk.
Worked at Window power project ACT ii with descon engineering pvt.ltd.
Map leaf cement factory line iii
Project Map Leaf CP.10052
Responsibilities
Supervision of construction of C.F Silo, (Raw Meal Silo) columns and embedded Templates and different level of slab roof.
Working of clinker silo Transport and storage Platform construct the supervision pan conveyor pedestal and install the anchor Bolts and pan conveyor Flooring.
To promote area incharge and construct the supervision compressor-Room-02 with all respect. Foundation excavation, Tie Beam and Plinth Beam, Pre-cast Double Tee Slab and water proofing and R.c.c. Flooring.
Also working the cement silo construct with supervision different level of slab, beam, roof and cement silo (ii) compressor Room.
I have been responsible to complete held on progress and quality of the concerned activities.
Checking the quality of working according to project specification.
According the drawing site inspection and check quality of form work and steel erection.
Project Pakpattan Canal and Khadir Branch Pakpttan Islam Link (Contract PCSBIP/ICB-01), construction of cattle Bath Station on Pakpattan canal/upper.
Responsibilities
Working at site supervisor at Sinohydro-NEL construct with the supervision of cross-Regulator and cattle bath station different RD.
Construct the UP/S curtain wall and D/S curtain wall and UP/S abutments walls at Both Sides.
Construct the Pier cross-Regulator and slab.
Work at the cattle Bath Station the tee Wall D/S and UP/S, abutments and UP/S Bed.
Checking the quality of working according to the project.
According to the drawing and specification inspected / checked the quality of Form work and Steel Fixing.
Project Metro Train Orange Line Package (ii) Lahore.
Responsibilities
I have been deputed as Trainee Engineer on their Metro Train Orange Line Package (ii) Lahore Project. I have been leading and supervising the Pile cap and pier construction and checked bar bending schedule.
According the drawing site inspection and check quality of Formwork and steel fixing.
Check the Pile cap and Pier Drawings.
Project Construction of Under-Pass at Sheikhupura-Hafizabad- Road.
Responsibilities
I have been deputed as Trainee Engineer on their Sheikhupura-Hafizabad- Road, under-pass Project. I have been leading and supervision Road construction and installation the Pile and checked bar bending schedule, Survey work.
Check the Pile drawing and Bar-Bending Schedule.
Checking the level of sub grade and sub base.
According the drawing site inspection and check quality of steel fixing.