Dear Sir,
My name is Syed Noman Ali Shah,
I have in total more than 6 years of experience in the field of civil engineering in all sectors like bridges, roads, buildings , infrastructure , structural design , project management and scheduling , power projects , heavy turbines foundations , piling activities ,
Recent i have worked on many power projects as a consultant my company is affialiated with a german company Lahmeyer International and i have worked with many international experts and companies like HYDROCHINA, SIDRI, CGGC , CSCEC , Power china , HUBEI INTERNATIONAL , CHOTIAN , SHUNTIAN , HAWA , ARTISTIC MILLINERS , HARTFORD , UEP , CHINA THREE GORGES, GE , SGURR , TUV , JS , JCM , IFC , OPEC , my completed projects and those projects in which i was the part are as under,
Resident civil engineer at wind power projects
Completed -100 megawatt UEP wind project
Completed -100 megawatt Three gorges wind project
Completed -50 megawatt AEPL wind project
Completed -50 megawatt HAWA wind project
Lenders Engineer at : 660 MW Thar coal project
Lenders Engineer at : 660 MW Lucky coal project
Lenders Engineer at : 50 MW Zaphyre offshore wind project
Willing to relocate: Anywhere
As a project manager I worked on the the complete project management on Primavera check the engineering , management ,review and implementation of drawings, site construction , quality management of the project.
RESIDENT CIVIL ENGINEER at RENEWABLE ENERGY as civil design and site engineer since 1stsep 2016 , on a wind projects of UEP of 100 megwatt and CTG(China three gorges) of 100 megawatt ,Hartford 50 megawatt , HAWA 50 megawatt , 50MW master wind project
Visited 660 MW thar coal project as a lenders engineer from Lahmeyer and banks, evaluated the power plant construction activities and mining activities.
Visited 660 MW Lucky coal project as a lenders engineer from Lahmeyer and banks, evaluated the power plant site , layout study , feasibility study , risk assessment
Visited 50 MW Zaphyre wind project as a lenders engineer from Lahmeyer and banks, evaluated all construction activities , piling activities , Mass concrete of WTG foundation activities , substation civil works
My company has a joint venture with international German company LAHMEYER INTERNATIONAL, And I also worked with many international companies in this project like HYDROCHINA, SIDRI, CGGC , CSCEC , Power china , HUBEI INTERNATIONAL , CHOTIAN , SHUNTIAN , HAWA , ARTISTIC MILLINERS , HARTFORD , UEP , CHINA THREE GORGES
-Making WBS on primavera
-Supervision of all civil activities
-Analyzing and making whole schedule of project
- Review of structural drawings and all construction documents
- Implementation of drawings on site
- Managing all the site activities
- Managing the all documents and contracts work
- Maintaining the schedule and breakdown structure
- Structural drawings modification / as-built drawings
-Making the latest forecast
-Managing building, roads, culverts , large foundations civil works
-Quality assurance and quality control of all civil works
-Laboratory testing and monitoring of all lab activities regarding civil works , cube crushing,fdt , proctor test , etc
- Leading the meetings with the stakeholders and reviewing the mom
CONSTRUCTION MANAGER at PROGRESSIVE BUILDERS as civil design and construction engineer since june 2016, on a buildings of DHA Karachi
-Analyze the structural drawings
-Implementation of structural drawing on site
-Reviewing and modifying structural drawings
-Managing all the site activities of civil works
PROJECT SITE ENGINEER at OSMANI CONSULTANTS as a road specialist , construction supervision ,planning and cost estimation engineer for DHA PHASE 8 project over the area of 500 acres (Since September 2015)
-Construction supervision of all infrastructure and superstructure work
-Construction supervision of all internal and main roads over 500 acres plotting area , analyzing pci and distresses in roads
-Construction supervision of STP (sewerage treatment plant) , pumping station , graveyard , drains , tennis and skating courts , buildings .
-Planning of the project on primavera
-Cost estimation and preparation of BOQ
-Allotting and managing the resources, man power, material and machinery
-Managing the cash in flow and out flow , -understand the work scope, quantity and familiar with logical sequence
-preparing the work breakdown structure, -analyzing the gaps between planned and actual progress
-supervision of the civil work including the subcontracting, -preparation of the master schedule
CONSTRUCTION MANAGER at CONEX , for the bungalows and buildings construction at DHA .
-Planning and cost estimation
-Concrete mix design and Quantity analysis of all the construction works and finishes
-Site supervision and management of all civil works
-designing the drawings on AutoCAD according to plan
-managing the concrete plant for the construction of various design of products
- landscaping implementation and design and marketing.
DESIGN ENGINEER at AL-AJWAD CONSULTANTS, (JEDDAH), (Nasir and sons co.)
(consulting, design, planning, supervision, implementation) worked as structure design engineer,
Road design engineer, quantity engineer in JEDDAH
- Structural design of different villas, fillas , apartments on etab
- Site supervision and checking of my designed projects that work is done according to the design and the supervision of all civil work was my task.
- Road design of Dhaban Ewaan project , Ali al-murtada project, etc. , designed complete grading plan , profile plan, contour ,slope banding, elevation banding plans on CIVIL 3d.
- Find out the quantity of cut and fill of different projects like king abdullah city, rabigh, khules, mishal projects etc. on civil 3d
- Prepared the krookies of different projects ,Used gps at different sites for surveying work ,Used digital laser meter for the measurement of different sites
-Quantity surveying of all materials used in different villas has been done by me first measured them at site than prepared its BOQ
-Prepared all the documentation work of a project ,Prepared the qarar zara,-Prepared the taqrir moaina
-Prepared the Gsi file on Leica survey office ,-Processed the raw data of gps in Leica geo office
-Imported the survey points on CIVIL 3d of that processed data and prepared the cad file
CONSTRUCTION ENGINEER at AL-MISBAH consulting engineers, (July 2014 to march 2015) worked as a construction engineer at different sites and structure engineer at office for 8 months.
These are sites: Anwar tower, Gulistan-e-johar bungalow, Gulshan bungalow , Gulberg tower, etc.
My main site was Anwar tower (B+G+4),I have designed it and implemented the site initially from foundations ,plinth ,basement till the second story of (B+G+4) building, I had different tasks:
-Concrete mix design management. , -Structural design on etab
-Working on primavera & Microsoft Project for planning. , -Work BreakDown Structure and scheduling. , -Checking the alignment, 90 , etc . of the building, -Making of the daily schedules.
-Making sure the construction according to site, -Managing levels through the help of water level -Bar bending schedules , -Managing the labors
-Managing the shuttering work, checking all the perimeters of the shuttering which are necessary for the construction purposes.
-Taking the suitable decisions according to the site like where sunk slab should be given or where concealed beam is necessary, etc.
-Managing the reinforcement work according to the drawing, making possible the spacing between the bars, dia of the bar, bar size, according to the site and drawings.
-Calculation of the different quantities like, concrete, cement bags, blocks, reinforcement, etc
PROJECT ENGINEER at ZOT (ZULFIQARABAD OIL AND GAS TERMINAL) from
Last 1 year (June 2013 to July 2014) (Near PORT QASIM KARACHI)
It is a SITE over 200 acre I am Project Manager in Mehram Traders a Government
Contractor and It is project under KMC (Karachi Municipal Corporation). I am managing all the engineering work like:
-Bar Bending Schedule
-Working on total station , level machine and theodolite.
-Surveying Works (Coordinate & Levels)
-Management of the Batching Plant (Interpreting the different ratios of the concrete) -Quantity Surveying
-Cost Analysis of the Material used
-Machinery and the labor utilization
-Management of all the concrete works
-Material checking and testing by making cubes and cylinders
-Making possible working according to the structural drawings and profile. -Difference of the base courses has been calculated. (Levels, FRL, NGL)
CIVIL ENGINEER (trainee engineer) at MEHRAN HIGHWAY from the Consultant NAA , KMC project
-pavement inspection and whole civil works were managed at June 2013.
-Checking of the different base courses.
-Managing the work according to the profile and levels.-Checking the quality of asphalt pavement.
-Managing the all civil works at site.
-Calculation of the different base course according to the site.-Management of the labors. -Managing the daily schedules.
NESPAK: (trainee engineer) (June 2012)"Project management division" our project was BBIA (Benazir Bhutto international airport) , A project of 50 billion ,I have analyzed whole procedure of the CONTRACT DOCUMENTATION ( FIDIC) , from the procurement of the project then financial and technical proposals have been made and whole construction drawings, structural drawings have been analyzed.
PARAGON CONTRACTORS: (trainee engineer) (December 2011) "Site Supervisor at the AL- KARAM textile mills warehouse construction, My work was Quantity analysis , reinforcement scheduling and whole site management.