WORKING EXPERIENCE
WORKING PROJECTS
Managing mechanical workshops machines operations maintenance and repairing scheduled and un-planned.
Guiding and training the workshop team
Leading mechanical welders, fabricators, machinists, and other mechanical persons.
Ro plant 10 ton, 15 ton, 20 ton erection, installation, erection and commissioning
Boiler of 10 ton erection, installation and commissioning
Condensate system for hosiery unit and towel unit designed and installed with lines, pump stations tanks and all fittings
Fire hydrant line system for towel new unit installed
Fire hydrant system of hosiery unit modified and extended
Heat exchangers new made for processing unit
1000 Liter/hr drinking water system plant installation
Hot and cold water lines modified
240 ton hot water chiller erection and installation with complete lines and cooling tower
Packing, cutting, stitching tables, racks, and other structures new made.
Close and open water system for chillers installed
Processing machines synchronization with return line , with water level gauges
Boarding machines, processing machines dryers erection and installation
Old steam and water lines modification re-erection and installation
Lift gates and cabins new made
New water turbine lines installed and connected to main over head tank
Supervision of towel unit and hosiery unit mechanical workshops
Planning for new mechanical projects, making cost sheets, designs, and proceeding for approval and completion.
Making daily, monthly, working reports and projects reports.
WORKING PROJECTS
Worked on 20mw steam turbines, 100 ton boiler, project of erection and installation (with coordination of Chinese engineers)
Erection and installation of HFO engines Wartsila, Man, with complete pipe lines
Hot cold steam pipe lines erection fabrication and ins
WORKING EXPERIENCE
WORKING PROJECTS
Managing mechanical workshops machines operations maintenance and repairing scheduled and un-planned.
Guiding and training the workshop team
Leading mechanical welders, fabricators, machinists, and other mechanical persons.
Ro plant 10 ton, 15 ton, 20 ton erection, installation, erection and commissioning
Boiler of 10 ton erection, installation and commissioning
Condensate system for hosiery unit and towel unit designed and installed with lines, pump stations tanks and all fittings
Fire hydrant line system for towel new unit installed
Fire hydrant system of hosiery unit modified and extended
Heat exchangers new made for processing unit
1000 Liter/hr drinking water system plant installation
Hot and cold water lines modified
240 ton hot water chiller erection and installation with complete lines and cooling tower
Packing, cutting, stitching tables, racks, and other structures new made.
Close and open water system for chillers installed
Processing machines synchronization with return line , with water level gauges
Boarding machines, processing machines dryers erection and installation
Old steam and water lines modification re-erection and installation
Lift gates and cabins new made
New water turbine lines installed and connected to main over head tank
Supervision of towel unit and hosiery unit mechanical workshops
Planning for new mechanical projects, making cost sheets, designs, and proceeding for approval and completion.
Making daily, monthly, working reports and projects reports.
WORKING PROJECTS
Worked on 20mw steam turbines, 100 ton boiler, project of erection and installation (with coordination of Chinese engineers)
Erection and installation of HFO engines Wartsila, Man, with complete pipe lines
Hot cold steam pipe lines erection fabrication and ins