Performance and result-driven with an aim to work in a catalytic environment where my existing skills are further honed and polished along with the attainment of new ones through a versatile professional environment. Hardworking, determined, competent, confident, optimistic, and experienced by the dint of numerous internships and volunteer programs. Confident in my abilities and aspire to construct a personal brand by developing new skills, abilities, and character that will elevate me on the corporate ladder. A creative thinker, problem-solver, and decision-maker who GET THINGS DONE.
Motion and time study for the optimisation and minimisation of setup time to improve efficiency and productivity.
Process re-engineering to introduce and implement new technology and methods to increase output and efficiency.
To make daily machine production and utilization report.
To implement H&S measures to ensure the safety of workers.
To save cost, resources and labour time.
To reduce the labour overtime.
To ensure the use of PPEs at floor and machine level.
Monitor and control machine breakdown time and cross match with one pager production report.
Assisted in analyzing existing manufacturing processes to identify inefficiencies and bottlenecks, resulting in a 15% reduction in production time.
Collaborated with the quality control team to develop and implement inspection procedures, leading to a 20% decrease in defects and customer complaints.
Supported the project management team in executing process improvement initiatives, ensuring timely completion and adherence to project scope.
Conducted time studies and data analysis to optimize workstations, improving worker efficiency by 10% and reducing fatigue.
Assisted in the implementation of a Kanban system, resulting in a 25% reduction in inventory holding costs and improved material flow.
Led a team in analyzing a production line and identifying key areas for improvement using Lean Six Sigma methodologies.
Implemented process changes, resulting in a 30% reduction in cycle time and a 15% increase in overall productivity.
Presented project findings and recommendations to faculty and industry professionals, demonstrating effective communication and presentation skills.
Ensured line balancing and layout design with agreed-upon production plans, minimizing bottlenecks and enhancing throughput.