I worked as a helper at "Zayyan Industrial Automation and Control Systems for six months. I worked with Automation Engineers inside and outside of the company.
As an Electronic Technician, I worked at "Al Khayyam Textile" for 8 months, where I maintained the sensors of the “Saurer BD-7” and “Saurer BD-480” machines. Repair and replace "ECCP-1," "Corolab-Q," "Corolab-Q2," and "Corolab-F2" sensors. Fix the lens of the "Yarn Brake Sensor". When the machine units shut down due to overheating of the power supply, I remove the hot power supply from the machine units and when the power supply cools down, I plug it back into the machine units. Take a daily reading of all running machines, LT and HT panels and the Air Conditioning plant panel.