概要

I am a performance-driven professional with over four years’ experience in civil engineering and project management. Proven success understanding project specifications and developing schedules to meet budgets targets. Track record of excellence in completing field jobs within set guidelines and regulatory agency requirements. I am adept at recommending improvements to ensure optimal quality of all project schedules. Skilled in coordinating resources, developing a realistic project schedule and meeting the demands of each client. Ability to plan, execute, and finalize multiple complex projects against business requirements while complying with budget and time constraints. Able to build long-term working relationships and motivate construction teams, while maintaining high standards of work. Seek to benefit top organization by improving performance, return on investment, and quality through project implementation.


My key skills include Civil Engineering • Project Management • Budgeting & Cost Reduction • Equipment’s Performance • Team Leadership & Training • Site Management • Process Improvement • Health & Safety Management • Operational Excellence


Technical Skills: AutoCAD, Primavera P6 (Certified), MS Office, MS Project Professional


My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such I would welcome a discussion regarding opportunities with your organization that fit my background.

工作经历

公司标识
Planning Engineer
Zhongmei Engineering Group Ltd
Jul 2022 - 代表 | Chilas, Pakistan

Construction of Right Bank Periphery Road (RBPR-04), Diamer Basha Dam Project
Examine project specifications, existing processes, and staff performance as well as design time schedules to meet budgets. Create baseline program, schedules, milestones, deliverables, and timelines according to project management plan. Oversee and track project progress, and produce reports in a timely manner to meet all contract requirements. Design and execute planned versus actual progress charts (histograms/S curves). Complete all projects within time and budget constraints. Ensure allocation of resources by delivering recommendations to maintain required progress. Assess gaps between the planned and actual progress as well as highlight the areas of concern to take effective actions. Provide notices to the Engineer to claim extension of time.
Key Accomplishments

Applied Excel and Primavera P6 to develop IFC delay schedule, evaluate delays occurred due to delayed IFC drawings, and deliver reports to the Engineer.
Secured the best prices by conducting negotiation with contractors and vendors.
Ensured accurate diagnosis and swift resolution of planning/contractual issues in liaison with the engineer and client
Developed everyday reports, look ahead plans, cash flow, and extension of time claims as well as performed P6 based analysis to reflect the impact of delay.

公司标识
Planning Engineer
CHINA GEZHOUBA GROUP CORPORATION (CGGC)
Sep 2020 - Jul 2022 | Mohmand, Pakistan

Mohmand Dam Hydropower Project, (MDHP).
Achieve bottom-line results by developing baseline program, schedules, milestones, deliverables, and timelines as per the project management plan. Create and retain records and schedules for EOT claim to incorporate all delay events incurred in the DTP. Apply Excel to design and submit IFC delay schedule to the Engineer for assessing delays due to delayed IFC drawings. Develop and deliver time impact (window) analysis to the engineer on a monthly basis. Hold full accountability for examining existing processes, manpower, and equipment’s performance and resolving deficiencies. Build synergies with project parties to organize project status reports and deliver notices to the engineer to claim extension of time. Facilitate the Senior Planning Engineer in producing EOT claims and executing planned versus actual progress charts (histograms/S curves). Actively contribute in monthly progress meetings to discuss issues with the Engineer and Employer. Identify project specifications and designed time schedules and budgets to meet business goals.
Key Accomplishments

Utilized Primavera P6 (EVM techniques) to develop look ahead plans/cash flow, examine, measure, and track the project progress, and deliver reports to the management on a regular basis.
Developed forecasts and PowerPoint presentation for monthly progress review meeting with the employer and engineer to ensure significant deviations from scheduled baselines.
Set a benchmark of excellence by recognizing schedule variances of project status against schedule baseline, examining allocation of resources, and offering recommendations to assure mandatory progress.
Expertly worked on the Mohmand Dam Hydro Power Project of total cost $2.4B as a Planning Engineer.

公司标识
Junior Planning Engineer
Pakistan Engineering Services Pvt. Ltd.
Sep 2018 - Sep 2020 | Swabi, Pakistan

Bada Dam Project (1.4billion PKR)

Functioned in close collaboration with all project parties to Identify schedule variances and collect project status reports against the planned baseline.
Succeeded in leading regular project site inspections while participating in meeting with the client, concerned contractor, and executing agency.
Facilitated the management in developing reports, baseline program, deliverables, schedules, milestones, and timelines while following the management plan.
Efficiently handled various activities of Bada Dam Project in Swabi KPK of total cost of 1.4B PKR.

学历

International Islamic University Islamabad-Pakistan
学士, 理工学士, ‎
Civil Engineering
CGPA 2.7/4
2018
Peshawar Public School and College Peshawar.
中级/A级, , ‎
PRE ENGINEERING
所占比重 75%
2014
Islamia Collegiate School Pesahwar
大学入学/0级, , ‎
Science
所占比重 82%
2012

技能

熟练 AutoCAD Command
熟练 Civil Planing Skills
中级 Civil Supervision Skills
中级 Complaint Handling
熟练 Cooordination Skills
中级 Documents Maintenance Skills
熟练 Excel
熟练 MS Office
熟练 Planning
熟练 Power Point
熟练 Report Writing Skills
中级 Wastewater Network Design

语言

熟练 乌尔都语
熟练 普什图语
熟练 英语