I am a Mechanical Engineer having 3 years of experience working in manufacturing as well as the services industry. Latest I have worked with Descon Engineering QATAR LLC. I worked as a Leadman. It's a diverse position where you have to perform as a Supervisor and HSE Officer combined. Trained in Qatar Chemical Leadman, Q-chem work crew, Confined space entry, permit to work system, Lock, try tag-out system, industrial safety. I have also worked at Bin Rasheed colors and chemical private Limited. I have worked as an Assistant Manager Mechanical. My role involved Maintenance Planning, Maintenance Supervision, EME Inventory Management, Dealing with 3rd party Contractors, Vendors & Auditors, Assisting Deputy Manager in Mechanical Fabrication, Installation, Erection & Commissioning, 5S implementation, Technical Training conducting for Competence Building, Developing Risk Assessment, and Maintaining Mechanical & ISO 9001, 14001 & 45001 documentation. I got training in SAP Plant Maintenance, Maintenance Costing, AutoCAD, SketchUp, Basic life support fire safety, Job safety Analysis development, SOP development, and document control.
Development of Mechanical Drawings 2D &3D using AutoCAD
Writing Mechanical Engineering Reports
Content Writing on Mechanical & QHSE Topics
Carried out joint site inspection with Q-Chem representative for hazards & mitigations
Overviewed Job safety Analysis for the task at hand with Q-Chem shift supervisor
Prepared permit as per job requirement (Confined Space, Open Flame & General Work)
Conducted Tool Box Talk before activity
Coordinated with Q-Con designated site representative about Job activities
Inspected Scaffolding with INECO QC Inspector for work at height activities
Collaborated with Venture Gulf coordinator for technical requirements of the job
Ensured tool & personal protective equipment inspection before starting job activity
Lead crew to the assembly point in case of emergency and perform Roll Call
Maintained health & safety documents (Work rest cycle, excavation checklist, Hammer issuance, etc.)
Performed Last-minute risk assessment of task & evaluated risk potential
Provided assistance in investigating worksite related incident to Descon Safety Crew
Verified Lock, Tag & Try for ensuring mechanical, electrical & elastic potential Isolation of equipment
Performed Bump Testing of gas monitors (H2S, CO, SO2, O2 & LEL%)
Maintained Turnaround flange management tags for ensuring Hydro testing, N2 Pressurization & Leak Test
Prepared Preventive maintenance plan & supervised implementation
Inventory management & Budgeting for maintenance resources monthly
Acted as communication focal point for liaison with operations, vendors & 3rd party contractors
Initiated Technical Training Program for the workforce for competence building
Collaborated in Installation of 6 Automatic Bag Filling Machines with Multi-Links
Prepared maintenance checklists for existing & new mechanical equipment’s
Provided Technical support to purchasing officer
5S Implementation in Mechanical Workshop
QHSE & ERT Team Member (Departmental Representative)
Maintained departmental ISO 9001: 2015, ISO 14001: 2015 & 0HSAS 18001:2015 documentation
Carried out a mechanical workshop risk assessment using a 5x5 matrix
Conducted departmental health & safety training (Welding safety, Work at Height & Transport safety)
Performed as Auditee in external audits by RICI Pakistan, Packages Limited & Roshan Packages Limited