خلاصہ

I am providing operational support to Companys Asset with respect to Integrity, Corrosion monitoring and corrosion protection. I am responsible for assessment and analysis of inspection and integrity management activities. I have excellent working practice on Quality management system (QMS), Plant Integrity, Corrosion engineering management, Risk assessment and damage mechanism analysis. I have approval by SAUDI ARAMCO as well as approval with appreciation by SABIC for Inspections and QA/QC. I am qualified as Engineering graduate with professional experience of 7 years (Qatar, Saudi Arabia and Pakistan) for Onshore (Upstream-Midstream-Downstream) In-Service Inspections (online/offline stream) and QA/QC at new Construction Projects, Maintenance, Upgradation, Modification, Shutdowns and Turnarounds of Oil Gas, Petrochemical, Refinery, Fertilizer, Amine, Glycol, GTL (LPG LNG) and Steel Plant. I am expert in Inspections of Process Plant Piping Equipment, Wellhead Piping, Cross-Country Pipeline, Storage Tank (cylindrical, rectangular), Pressure vessel, production separator vessel, Filter drum, Tower column, Heat Exchanger, Cooler, Compressor, Pumps and Steel Structures. I am well expert in Drawing Study and Engineering Designs (PID, PFD, Isometrics, Plant Layout, Equipment Layout, Piping Layout, Plot Plan, Key Plan) with beneficial knowledge of ISO and Standard Codes such as ASME-I, II(Part-A, B, C), V, VIII, IX, B-31.3, B-31.4, B-31.8, B-16.5, B-16.20, B-16.21, B-16.47, ASNT-SNT-TC-1A CP-189, API 510, 570, 571, 653, 650, 579, 580, 1104, ANSI, AISI, ASTM, NACE, AWS-D1.1 and ARAMCO Standards (SAES, SAEP, SATIP, SAIC, SATR). I have working knowledge of Plant reliability in term of vibrations.

تجربہ

کمپنی کا لوگو
Field Integrity Engineer
United Energy Pakistan UEP, formerly BP Pakistan. (O&G E&P Co.)
جون ۲۰۱۸ - موجودہ | Karachi, Pakistan

کمپنی کا لوگو
QA/QC Inspector Mechanical & Piping
Arkad Engineering & Construction Company (EPIC)
دسمبر ۲۰۱٦ - نومبر ۲۰۱۷ | Khobar, Saudi Arabia

Projects:

1. Onshore Maintain Potential Project (OMPP), Northern Area Oil Upstream Projects (NA1B), Tie-In FADHLI-128/141/143/148 Well-Heads Oil Production at FP-02 drill site.
2. Onshore Maintain Potential Project (OMPP), Northern Area Oil Upstream Projects (NA1B), Tie-In KHURSANIYA-128/133/134 Well-Heads Oil Production at KP-29 Drill Site.
 Well-Head Line, Flow Line, Test Header, Production Header, Equalizer Bypass, Jump overs, Lateral Line, MPFM Inlet & Outlet, Scraper Launcher & Receiver Lines. Trunk Line A/G & U/G, Corrosion Monitoring System (CMS), Kill connections, sampling connection, sampling pot, Annulus riser, Chemical Injection Line, Corrosion Inhibitor Skid, MPFM and SPI.

کمپنی کا لوگو
QA/QC Engineer Mechanical
SENDAN International Company LTD
فروری ۲۰۱۴ - ستمبر ۲۰۱٦ | Jubail Industrial City, Saudi Arabia

Projects & Shutdowns:

1. Replacement of 14\" Recovered Water Line (9KM Length) at RC Corridor (Cross-country Pipeline) in SADAF Saudi Petrochemical Company-SABIC Affiliate (Project).
2. Installation of Natural Gas Black Powder Filter Vessels in SADAF Saudi Petrochemical Company-SABIC Affiliate (Project).
3. Installation of oxygen mixing station (OMS), High Pressure Vessel & Filter Drums with associated Nitrogen Line in SAUDI KAYAN Petrochemical Company-SABIC Affiliate (Shutdown).
4. Hot-Tapping Tie-ins for 6th effect evaporator bypass line supply & construction in SAUDI KAYAN Petrochemical Company-SABIC Affiliate (Shutdown).
5. Upgrading Benzene Infrastructure Bottom Plate Replacement for Benzene Tank No. 71-TK-8 at SABTANK and 53-TK-13 at SADAF Saudi Petrochemical Company-SABIC Affiliate (Project).
6. Upgrade PO4 & Eliminox Positive Displacement Pumps in SADAF Saudi Petrochemical Company-SABIC Affiliate (Project).
7. Provision of Individual Lube Oil Consoles for BFW Pumps (1P-8004- A/B/C/D) in SHARQ Eastern Petrochemical Company-SABIC Affiliate (Shutdown).
8. HRSG Boiler Liner Plates Replacement in Mixing Chamber, Super Heater, SCR in TASNEE Saudi Ethylene & Polyethylene Company, PDH Unit (Emergency Shutdown).
9. MHI – AR-RAZI STA 2014, ATR Hot Spot , E-5206 Heat Exchanger Maintenance, Distillation Column Tower T-5501, T-552, T-5503, XV-5309 Valve Relocation Work and ATR Lead Pressure Piping in AR-RAZI Saudi Methanol Plant-V-SABIC Affiliate with MITSUBISHI Heavy Industries, LTD (Shutdown).
10. New Line with Valve for Diverting Urea Solution from 23018J to 3007F (After LV8214) in IBB/SAFCO Fertilizer Company-SABIC Affiliate (Shutdown).
11. Insertion of Lateral Screen section of perforated plates in Molecular Sieve Adsorbent Vessel at National Industries Gases Company, GAS-SABIC Affiliate (Shutdown).
12. Up-gradation of material handling system & de-dusting for Steel Mill 1, 2, 3 Electric Arc Furnace at HADEED plant-SABIC (Shutdown).

کمپنی کا لوگو
Quality Control (QC) Engineer
SEFEC Engineering (PVT) LTD
مارچ ۲۰۱۳ - جنوری ۲۰۱۴ | Karachi, Pakistan

Project:

1. KPD-TAY Integrated Development Project Kunnar LPG Plant Phase-II, Piping works at OGDCL Company (Project).

کمپنی کا لوگو
Management Trainee Engineer (QA/QC)
Etimaad Qatar L.L.C
نومبر ۲۰۱۱ - مارچ ۲۰۱۳ | Doha, Qatar

Projects & Shutdowns:

1. EPIC of New Diesel Tank, Flare Nozzle Tip Maintenance & Maintenance work of Crude Oil Naphtha Tank Bund Wall in Qatar Petroleum Refinery Tank Farm (Project).
2. Construction works for TIE-INS of OSGP work with Technip Middle East in ORYX-GTL, LNG Plant (Shutdown).
3. Additional Mechanical / Piping / Civil / Electrical / Instrumentation Jobs in Ammonia-1 and Urea-1 Plants in QAFCO Qatar Fertilizer Company (Shutdown).

تعلیم

Bahauddin Zakariya University
بیچلرز, , Bachelors in Science‎
Metallurgy & Materials
2011

زبانیں

ماہر سرائیکی
ماہر پنجابی
ماہر اردو
ماہر انگریزی