To secure an appointment in a professionally run organization where my skills are best utilized so as to achieve the company's objectives and enhance my career development.
• Construction of park View Apartments at 18 D-1 Gulberg-III, Lahore.
• To determine and develop the most suitable and economically viable construction and engineering methods for projects.
• To work closely with site managers of contractor, Resident Engineer of Project Managers/consultant and designers to ensure a project runs on schedule and that material supplies are sufficient.
• Administers, oversees, and coordinates the activities of a range of specified operating and support programs, as appropriate to the objectives of the unit.
• Oversees the supervision of personnel, which includes work allocation, enforcement of internal procedures and controls, and problem resolution; evaluates performance and makes recommendations for personnel actions; motivates employees to achieve peak productivity and performance.
• Participates in development, implementation and maintenance of policies, objectives, short-and long-range planning; develops and implements projects and programs to assist in accomplishment of established goals.
• Deciding on the most appropriate engineering techniques and sequences of activities for each project stage.
• Making estimations for timescales and costs.
• Check and prepares monthly report reflecting work progress summary.
• Propose to the Project Managers about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
• Check and develop work method of statement or procedure as required.
• Liaises with all team leaders and/or members to communicate required completion dates and interface between functional team/operational team and project team.
• Participate all meeting ( i.e schedule review meeting , progress meeting, coordination meeting, construct ability review meeting and so on).
• Construction of Park one Residential and Commercial Complex at F-10 Islamabad.
• Preparation and management of planning and project control system for supporting the Project Management Team to achieve project goals according to the internal baselines and in compliance with the contractual dates and requirements.
Project Undertaken: Development of Infra Structure at New Lahore City Phase II, Lahore.
• Preparation and management of planning and project control system for supporting the Project Management Team to achieve project goals according to the internal baselines and in compliance with the contractual dates and requirements.
• Collection, verification, and integration of the work scope for all entities/subcontractors into the project plan. Estimation of work quantities at tender stage and execution stage. Supervise team of quantity surveyors to estimate the project budget and resources.
• Preparation of budget histograms, tables, curves, resource logs (Manpower, Materials, and Equipment) as reference baselines for the control during the various project execution phases.
• Calculation of prolongation costs (for time-based resources) due to extension using contractually defined parameters.
• Calculation of disruption costs due to delays attributable to client.
Participating in regular meetings for discussing and defending cost claims.
• Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
Project Undertaken: Bulleh Shah 1x150 T/H Biomass Boiler Island Project Kasur Pakistan.
• Prepare and manage overall master schedule integrating work breakdown structure using scheduling software Primavera P-6.
• Prepare cost estimation and schedule bar chart plan considering all inputs (manpower, equipments and materials) availability, production and construction sequences.
• Develop work method of statement or procedure as required.
• Understand and able to utilize planning tools such as MS excel, MS Project, Primavera.
• Develop and update resource (manpower and equipment) histogram weekly or monthly as required.
• Evaluate allocation of resources and provide recommendations to maintain required progress.
• Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
Project Undertaken:
• Construction of EOBI Hotel Mix Design near Lahore International Airport Lahore.
• Construction of Fuji Fertilizer Bin Qasim Limited (FFBL) Head Office DHA Phase 2, Islamabad.
• Nishat Hotel and Retail Mall Johar Town Lahore.
Responsibilities:
•Responsible for Preparing the Project Summary Reports, Cash Flow, Delay Logs and claims on the basis of FIDIC General Conditions of Contract for the approval of extension of time (EOT).
• Prepare monthly & weekly look ahead plan from the baseline schedule and then deliver to the site for implementation and monitor them on regular basis from daily progress reports.
• Prepare actual weekly work done report in terms of revenue from daily progress reports.
• Updated the baseline construction schedule by the end of every month on actual dates.
• Prepare S-Curves (Both Financial and Physical Progress).
• Prepare and update the minutes of meeting (MOM) & progress review meeting (PRM)
• Developing detailed yet simple to understand schedules (monthly, fortnightly, and weekly).
• Resource Planning (includes Manpower, Tools & Plant, Machinery, Money etc.)
Project Undertaken:Construction of EOBI Hotel and Mixed Used Development near Lahore International Airport Lahore.
• Allocate work to other members of team in order to ensure delivery of design to quality, time and budget.
• Communicating with sub-contractors to fulfill tasks within time limit by provided specifications.
• Responsible for layout and preliminary drawings for piling and excavation works.
• Responsible for the site visit of client’s, consultant’s & Contractor’s representatives.
• Act as project or site engineer for multi-storey structure.
• Timely delivered civil engineering design deliverables which meet the client's expectations.